Soil test in Dhaka & Bangladesh

Before you design the foundation, you test the ground. Boreholes, lab tests, and a report RAJUK accepts.

Every building stands on its foundation, and every foundation stands on soil nobody has seen. A soil test tells you what is actually under your plot — how much weight the ground can carry, how deep the foundation must go, and whether the water table will cause trouble.

RAJUK asks for a soil test report with most approval applications, and your structural engineer cannot design a safe foundation without one. This guide explains how the test works, how many boreholes you need, and what it costs in 2026.

What a soil test actually is

A soil test — properly, a geotechnical investigation — drills boreholes into your plot, takes soil samples at depth, and tests them in a lab. The standard field test is the SPT (Standard Penetration Test), done roughly every 1.5 metres as the drill goes down.

The result is a report with the soil profile at each borehole, the safe bearing capacity at each depth, the water table level, and a recommendation for the foundation type and depth.

How many boreholes does your plot need?

The number of boreholes depends on the plot size. The BUET guideline is:

  • Up to 3 katha: 3 boreholes.
  • 3 to 5 katha: 5 boreholes.
  • 6 to 10 katha: 8 boreholes.
  • Minimum in Dhaka: 3 boreholes, even for a small plot.

More boreholes are needed for larger plots, filled land, or plots near water. Your engineer decides the final number after seeing the site.

What the report gives you

  • Safe bearing capacity — how much load the soil can carry at each depth.
  • Foundation recommendation — shallow footing, deep footing, or pile, and at what depth.
  • Soil profile — what layers are under your plot (clay, sand, silt, fill).
  • Water table level — critical for basements and for construction in the monsoon.
  • Settlement estimate — how much the building is expected to settle, and whether it is safe.

How the test is done, step by step

  • 1. Site visit. The engineer sees the plot, access for the rig, and any filled or low areas.
  • 2. Drilling. Boreholes are drilled to 20, 25, or 30 metres depending on the building — deeper for taller buildings. Drilling a few points usually takes 1 to 3 days.
  • 3. SPT and sampling. The penetration test runs as the drill goes down; soil samples are sealed and sent to the lab.
  • 4. Lab tests. Grain size, moisture, shear strength, and consolidation tests on the samples.
  • 5. Report. The engineer writes the report with bearing capacities and the foundation recommendation, usually a few days after the lab work finishes.

Soil test cost in Bangladesh (2026)

These are published market rates — what testing labs charge, not Space Up’s fee. We arrange the test for your plot and use the report in your structural design; our fee is quoted per project.

  • BUET (BRTC schedule, April 2026): Tk 80,000 per borehole (20 m), Tk 100,000 (25 m), Tk 135,000 (30 m) — including tests and report.
  • Private firms: roughly Tk 7,000–25,000 per point, depending on depth and the tests included.
  • Example published rate: from Tk 7,000 per point up to 60 ft, Tk 10,000 per point up to 100 ft.

BUET is the reference lab and the most expensive; private labs cost less. For most houses, a private lab report is accepted — confirm with your engineer and with RAJUK for your file.

Soil test and your foundation

The report decides the foundation. Strong, shallow soil means a simple footing. Weak or filled soil means deeper footings or piles — which cost more, but cost far less than a building that settles and cracks.

This is also why the soil test must come before the structural drawings, not after. A foundation designed on a guess is a guess. Space Up never designs a foundation without the report for that exact plot — a report from a neighbouring plot does not count.

Frequently asked questions

How much does a soil test cost in Dhaka?

BUET charges Tk 80,000–135,000 per borehole (20–30 m, including tests and report, April 2026 schedule). Private firms charge roughly Tk 7,000–25,000 per point depending on depth. The total depends on how many boreholes your plot needs.

How many boreholes do I need for my plot?

The BUET guideline is 3 boreholes up to 3 katha, 5 for 3–5 katha, and 8 for 6–10 katha, with a minimum of 3 in Dhaka. Your engineer confirms the number after seeing the site.

Is a soil test required for RAJUK approval?

In most cases, yes. The structural drawings must be based on a soil test report, and RAJUK asks for it with the application.

How deep should the boreholes go?

Typically 20, 25, or 30 metres — deeper for taller buildings. Your structural engineer decides the depth from the building’s load.

How long does a soil test take?

Drilling a few points usually takes 1 to 3 days. The lab tests and the written report follow, usually within a few days after drilling finishes.

Can I use a soil test report from a neighbouring plot?

No. Soil changes from plot to plot — even next door. The report must be for your exact plot, or the foundation design is a guess.

Start with a conversation

Tell us about your plot or project — we will tell you honestly what it needs, what it costs, and how long it takes.

मुफ़्त परामर्श लें Book an Appointment WhatsApp

Updated November 2026 · Government fees and lab rates change — confirm the current schedule when you file. Space Up’s own fee is quoted per project.

कॉल करें पूछताछ भेजें