RAJUK Approval Drawing

RAJUK plan approval in Dhaka

From land-use clearance to construction permit — what RAJUK asks for, what it costs, how long it takes, and how we get it done.

You cannot legally build in Dhaka without RAJUK approval. Build without it and you risk a stop-work notice, a fine, or demolition — and no bank will finance the project.

Space Up has taken more than 100 projects through RAJUK approval. This guide explains the process the way it actually works in 2026: the two permissions, the four drawings, the government fees, and the timeline.

The two permissions you need

RAJUK approval is not one stamp — it is two permissions, one after the other. First comes the Land Use Clearance (LUC), which confirms your plot can be used the way you plan. Only then can you apply for the Construction Permit, which approves the building itself.

After construction finishes, there is a third step many people forget: the Occupancy Certificate, which confirms the building was built as approved and is safe to occupy.

  • Land Use Clearance (LUC) — confirms the permitted use of your plot under the DAP (Detailed Area Plan).
  • Construction Permit — approves your drawings and lets you build.
  • Occupancy Certificate — issued after construction, when RAJUK verifies the building matches the permit.

The four drawings RAJUK asks for

Every RAJUK application needs the same four drawing sets, prepared by licensed professionals and signed by an architect and engineers. Space Up prepares all four in-house, so nothing gets lost between firms.

  • Architectural drawings — plans, elevations, sections, and the site plan showing setbacks and FAR.
  • Structural drawings — foundation, columns, beams and slabs, based on your soil test report.
  • Plumbing drawings — water supply, drainage and sewerage.
  • Electrical drawings — load, wiring, and safety provisions.

Depending on the plot, RAJUK may also ask for a soil test report and a digital survey. We arrange both — see our soil test guide.

Step by step: how approval works

The process runs through RAJUK’s ECPS online portal (in use since 2024). In practice it goes like this:

  • 1. Papers first. Title deed (CS/RS/BS khatians), mutation, deed chain, and the plot’s DAP zone are checked before any drawing starts.
  • 2. Drawings + soil test + survey. The four drawing sets are prepared; the soil test and digital survey run in parallel.
  • 3. LUC application on ECPS. Submitted online with the drawings and papers.
  • 4. Construction permit application. Filed after the LUC, with the full drawing set and the government fee.
  • 5. Scrutiny and corrections. RAJUK checks setbacks, FAR, height, and fire safety. Most files need one or two rounds of corrections — this is normal, and it is where experience saves months.
  • 6. Permit issued. You build, with inspections along the way, then apply for the Occupancy Certificate.

Government fees in 2026

These are the government fees as published — they are what you pay RAJUK, not what you pay us. Our design and approval service fee is quoted per project, after we see your plot and papers.

  • Land Use Clearance: Tk 1,000 + 15% VAT.
  • Construction permit: Tk 1,000 + an area-based fee — Tk 175 for up to 50 sqm, rising to Tk 700 for up to 300 sqm, and higher for larger buildings.
  • Proposed change (not yet certain): rules proposed in late 2025 would raise the LUC fee to Tk 5,000 and add Tk 5,000 per katha for multi-unit blocks. Treat this as proposed until it is gazetted.

Government fees change. Confirm the current schedule when you file — we check it on every application.

How long does RAJUK approval take?

For a straightforward residential file, expect 3 to 6 months from submission to permit. Complex files — large apartments, commercial use, or plots with title complications — can take 4 to 8 months.

The biggest delays are almost never RAJUK itself. They are incomplete drawings, missing papers, and corrections that bounce back and forth. A file prepared properly the first time is usually the fastest file.

Why approvals get delayed or rejected

  • Drawings that do not match the DAP rules for the zone (FAR, setbacks, height).
  • Title problems — unclear deed chain, missing mutation, or disputed boundaries.
  • Structural drawings that do not match the soil test report.
  • Missing documents, or documents that do not match each other.
  • Building on a plot where the planned use is not permitted.

How Space Up helps

We have taken more than 100 projects through RAJUK approval — houses, apartments, mosques, offices, and healthcare buildings. Because the drawings, soil test, and survey are all handled by one team, the file goes in complete and the corrections stay small.

  • All four drawing sets prepared and signed in-house.
  • Soil test and digital survey arranged for your plot.
  • ECPS filing and follow-up until the permit is in hand.
  • Corrections handled — most files need a round or two, and we do them.

Frequently asked questions

How long does RAJUK approval take in Dhaka?

For a straightforward residential file, 3 to 6 months from submission to permit is typical. Complex files can take 4 to 8 months. The biggest delays come from incomplete drawings and missing papers, not from RAJUK itself.

How much is the RAJUK approval fee?

The government fee for Land Use Clearance is Tk 1,000 + 15% VAT. The construction permit is Tk 1,000 plus an area-based fee (Tk 175 up to 50 sqm, Tk 700 up to 300 sqm, higher for larger buildings). A 2025 proposal would raise the LUC fee to Tk 5,000, but it is not yet certain. Our service fee is quoted per project.

What documents do I need for RAJUK approval?

Title deed with the CS/RS/BS khatian chain, mutation papers, the four drawing sets (architectural, structural, plumbing, electrical), a soil test report, and a digital survey where required. We check your papers before drawing anything, so nothing is filed incomplete.

Can I build in Dhaka without RAJUK approval?

No. Building without a permit risks a stop-work notice, fines, and demolition — and banks will not finance an unapproved building. Always get the permit first.

What is ECPS?

ECPS is RAJUK’s online portal for plan submissions, in use since 2024. Applications, drawings, and fees are filed online, and scrutiny happens through the portal.

Do I need a soil test for RAJUK approval?

In most cases, yes — the structural design must be based on a soil test report, and RAJUK asks for it. We arrange the test for your plot and use the report in the structural drawings.

Start with a conversation

Tell us about your plot or project — we will tell you honestly what it needs, what it costs, and how long it takes.