Digital Survey
Digital survey in Dhaka & Bangladesh
An exact, measured map of your land — boundaries, levels, and contours — done with total station and GPS, ready for design and RAJUK.
No drawing is better than the measurement it starts from. A digital survey measures your plot exactly — its boundaries, its levels, its shape — with a total station and GPS, and turns those measurements into a drawing your architect can design on.
Every project Space Up designs starts with a survey. It is a small job that prevents the biggest mistakes: a building in the wrong place, a foundation designed for the wrong levels, or a boundary argued about after construction starts.
What a digital survey is
A digital survey — also called a land survey or topographical survey — is the precise measurement of a plot of land using electronic instruments. The two tools you will hear about are the total station, which measures angles and distances to millimetre accuracy, and GPS, which fixes the plot’s position on the map.
- Boundary survey — the exact edges of your plot, with dimensions and the position of boundary pillars.
- Topographical survey — the levels and contours of the land: what is high, what is low, and how water will run off.
- Detail survey — everything on the plot: existing structures, trees, drains, roads, and neighbouring buildings.
A digital survey measures the ground as it actually is. A deed or a Mouza map records what was written down — sometimes long ago. When the two disagree, the survey is what your architect designs on.
When you need one
- Before any design. Your architect needs the true shape, size, and levels of the plot before drawing a single line.
- For RAJUK approval. A survey drawing is part of most approval files — RAJUK needs to see the plot as measured, not as assumed.
- Before buying land. A survey checks that the plot on the ground matches the plot in the deed — its size, its shape, and its boundaries.
- When the boundary is unclear. If a neighbour’s wall, a drain, or a road eats into your plot, a measured survey records exactly where the line is.
- Before subdivision or sale. Splitting a plot or selling part of it needs a measured drawing of each new piece.
The process, step by step
- 1. Papers first. We look at your deed and Mouza map, so the surveyor knows what to check on the ground.
- 2. Field measurement. The survey team visits the plot with a total station and GPS, fixes the boundary pillars, and records levels across the site.
- 3. Data processing. The measurements are checked and drawn up in CAD — the survey drawing.
- 4. Report and drawing. You receive the survey drawing and a report with the plot area and levels, ready for design and for RAJUK.
- 5. Into the design. If Space Up is designing your building, the survey goes straight to the architects — the design starts on the measured plot, not on a guess.
What the report and drawing contain
- Boundary and dimensions — every side of the plot, measured, with the boundary pillars marked.
- Plot area — in square feet and katha, as measured on the ground.
- Contours and levels — the shape of the land, so the design and the drainage work with it.
- Existing features — buildings, trees, drains, walls, and roads on and around the plot.
- North point and road — orientation and access, which the design and the RAJUK file both need.
- Neighbouring plots — what sits on each side, so setbacks are measured from the right lines.
Digital survey cost in Bangladesh (2026)
These are published market ranges for survey work in Bangladesh (sbscltd.com) — what firms charge, not Space Up’s fee. Our fee is quoted per project, after we see the plot’s size and location.
- Basic survey: roughly Tk 20,000–50,000.
- Typical range: roughly Tk 50,000–500,000, depending on the plot and the detail required.
- Topographical survey: roughly Tk 150,000–300,000 for small to medium projects.
What changes the price: the size of the plot, how far it is from Dhaka, how much detail the drawing needs, and whether the report must be in RAJUK’s format. A small residential plot costs far less than a large commercial site.
How long does it take?
There is no single answer — a survey’s time depends on the plot, not on a price list. What decides it:
- Plot size. A small residential plot is measured in a day’s fieldwork; a large or irregular site takes longer.
- Access. If the plot is easy to reach and the boundary is clear, the fieldwork goes quickly. Locked gates, standing water, or a disputed boundary slow it down.
- Weather. Heavy rain stops fieldwork — monsoon season is the slowest time for surveys in Dhaka.
- Detail required. A simple boundary survey is faster than a full topographical survey with contours and every tree and drain recorded.
- The drawing. The report and CAD drawing are prepared after the fieldwork, and their time depends on how much detail they carry.
We give you a schedule when we see the plot and know what the survey must cover. If you have a deadline — a RAJUK filing date, a purchase decision — tell us at the start.
How Space Up helps
We have designed 200+ projects over 8+ years, and every one of them started with a measured plot. Because the survey and the design sit in the same studio, the drawings are made from the survey — not from a deed, and not from memory.
- Digital survey arranged for your plot — total station and GPS, boundary and levels.
- Survey drawing and report ready for design and for RAJUK.
- The survey goes straight to our architects, so the design starts on the true plot.
- One team from survey to drawings to approval — 100+ RAJUK approvals behind us.
সচরাচর জিজ্ঞাসিত প্রশ্ন
How much does a digital survey cost in Dhaka?
Published market ranges put a basic survey at roughly Tk 20,000–50,000, a typical job at Tk 50,000–500,000, and a topographical survey at roughly Tk 150,000–300,000 for small to medium projects (sbscltd.com). The price depends on plot size, location, and detail. Our fee is quoted per project — message us with your plot size and location.
What is the difference between a digital survey and a Mouza map?
A Mouza map is the old record map of an area — it shows plots as they were recorded, sometimes long ago, and it is not always to scale. A digital survey measures your actual plot on the ground, today, with instruments. The Mouza map tells you what the records say; the survey tells you what is really there.
Do I need a digital survey for RAJUK approval?
In most cases, yes — a survey drawing is part of most approval files, because RAJUK needs the plot as measured. We arrange the survey as part of the approval work, so the file goes in complete.
What should I have ready before the survey?
Your deed and Mouza map, access to the plot, and any boundary pillars or markers you know about. If part of the plot is locked, built on, or under water, tell the survey team before they visit.
How long does a digital survey take?
It depends on the plot. Fieldwork for a small residential plot is quick; larger plots, difficult access, monsoon rain, or a full topographical survey with contours all take longer. The drawing and report follow the fieldwork. We give you a schedule once we have seen the plot.
Can a survey settle a boundary dispute with a neighbour?
A survey measures and records the boundary as it stands on the ground, with dimensions you can show to anyone. That measured record supports your case — but settling a dispute is a legal matter, and it is decided on the deed and the law, not on the survey alone.